Contact
J. William Brown, P.E.
Assistant
City Engineer - Environmental
Jessica R. Chapman, P.E.
Senior Civil Engineer
Karen M. Sturgis, P.E.
Civil Engineer
Contact Information
You can reach our office during business hours by calling
864-467-4400
Fax: 864-467-5754
We are located at:
206 S. Main Street
(Eighth Floor)
Greenville, SC
Our mailing address:
City of Greenville,
Engineering Division
P.O. Box 2207
Greenville, SC 29602
or
email us with your questions or comments.
Links to Regulatory Partners
EPA
FEMA
U.S. Army Corps of
Engineers
SC DNR
SC DHEC
Reedy River
Water Levels

You will need
Adobe Acrobat Reader
to view some of the links on these pages. Click on the link to obtain the most recent version of this free software.
Storm Water
Pollution Prevention Plan
To help you develop the narrative section of your construction site SWPPP, the
City of Greenville has created electronic SWPPP templates. These templates are
designed to help guide you through the SWPPP development process and help ensure
that your SWPPP addresses all the necessary elements stated in your construction
general permit.
These templates cover the SWPPP elements that the State of South Carolina
Construction General Permit requires, however the template serves as
guidance only. You must customize this template t
o reflect the
conditions at your project site. The site-specific SWPPP must be
combined with proper and timely installation of the BMPs, thorough and frequent
inspections, maintenance, and documentation. For guidance on appropriate BMPs,
refer to the
South Carolina DHEC Stormwater Management BMP Handbook.
This document can be obtained at:
http://www.scdhec.gov/environment/ocrm/pubs/docs
/SW/BMP_Handbook/BMP_Handbook.pdf
You can also use these templates with EPA’s guidance on Developing Your
Stormwater Pollution Prevention Plan. This document can be obtained at:
http://www.epa.gov/npdes/pubs/sw_swppp_guide.pdf
The City of Greenville’s templates, forms, checklists and guidance documents can
be obtained by downloading the appropriate zip file. Your options are for sites
where the disturbance is greater than 10 acres and less than 10 acres. SWPPP are
not required. Click on the links below for downloadable ZIP files:
Site less than 10 acres
Site greater than 10 acres